New A.C. Rijnberg business premises

Project properties
Schedule
The new premises at the Terneuzen South business park consist of two warehouses each comprising 2,500 m². Both are equipped with eight loading docks and two large canopies for sheltered loading and unloading.
Complete design and coordination
We were involved in this project from the outset and produced the design with Rijnberg. During the design phase, we assisted in drawing up a final schedule of requirements based on the internal processes at the transport company. After this phase, we were responsible for the execution and coordination of the construction, including all infrastructural work.